One project, five hand-offs.
Here is the order in which a CEA facility goes through the group, what each company produces, and what it hands to the next one.
- 01
Plan the room
Canopy layout and light plan, before anything is bought.
Bench Cultivation lays out rolling benches or multi-tier racking to get the most canopy out of the floor plan. ILUMINAR builds the photometric layout on top of it: how many fixtures, which spectrum, what PPFD at canopy. Those two numbers set the electrical load, the HVAC load and the rebate estimate.
- 02
Check the incentives first
Pre-approval before purchase, so no rebate is lost.
The most expensive mistake in this industry is buying equipment before checking the utility program. Many utilities require pre-approval before purchase. What Rebates reviews the planned equipment against the programs in the facility's utility territory and files pre-approval where it is required.
- 03
Source the build
One quote for the equipment, in the United States or Canada.
Sustainable Pathways quotes the rest of the build (dehumidification, climate, nutrients, media, harvest equipment) with the specs and model numbers the utility application will ask for, through its operation in the United States or Canada.
- 04
Recover the capital
File, follow up, get paid. Fee only when it clears.
After installation, What Rebates assembles invoices and spec sheets, coordinates any utility inspection and follows the application until it is paid. Most clients are paid 6 to 12 weeks after filing. The fee is a percentage of what is recovered: nothing recovered, nothing owed.
- 05
Lower the monthly bill
On-site power, owned or bought under a PPA.
Once the facility runs, energy is the cost that never stops. Watt Alliance models on-site generation (solar, storage, natural gas or a hybrid) and proposes two options side by side: own the system, or buy the power at a fixed rate with no upfront capital.
You don't have to use all five.
Most projects come in through one door: a light layout, a rebate audit, an equipment quote, a bench layout or an energy proposal. From there we bring in the other companies only where they add something.
- Already bought the equipment? Many utilities accept retroactive applications for equipment installed within roughly 6 to 24 months. Rebates →
- Planning a new room? Start with the layout so the rebate is checked before purchase. Contact →
- Facility running, bill too high? Start with an energy proposal. Watt Alliance →